Skip to Main Content
 

This Q&A is now read-only

Official Q&A: VEX V5 Robotics Competition 2025-2026: Push Back

Usage Guidelines All Questions

3019: Using pvc piping to hep with loading


45030B
6-Jan-2026

My team planned on using a length of 4 inch PVC piping to allow them to load 6 balls in quick succession into an empty loader, I was wondering if this would be a violation of SG9?<SG9>

Answered by committee
8-Jan-2026

Using a section of PVC pipe to help with Match Loads is an example of using additional materials to simplify the game challenge during a Match, which is specifically disallowed by clause Aiii of rule <GG1>.